Wood Designer forum
prioritization of offcuts|Forum|WOOD DESIGNER

August 7, 2014

Hi,
Please add your opticut file for me to check, and also add your parameter file, which you can get via the menu tool/save parameters
regards
Michel

January 20, 2017

After discussion with the development team, you can prioritise the drop by increasing the off-cuts depreciation percentage.
All the best, Alex

January 20, 2017

I have send request to dev team’s to force cut-off first
but the tests seem consistent, by changing Off-cuts quality to max
>
Cheers, Alex

January 20, 2017

Hi,
I think you’re looking for this option
From Optimisation parameters > Advanced tab > Off-Cuts… > Select option “Use Stock follow-up Parameters”
Else there is no specific option to force Off-cuts first
I’ll ask to dev teams, if there is better solution or if news option can be create
Hope that’s helpful, Alex

March 25, 2024

If this is set up this should prioritize using the off-cuts.
Refer to the attached image, this is a job I have used to test and there are 3 x off-cuts used. Even though they are referenced as panel 2/3/5, not panel 1, they are still being used. OC won’t always reference them as number 1 in the list.
I can continue to run some tests on this.
Are you achieving the same results I am achieving?
Isaac
